You are hired to analyze (and improve upon) a preliminary design for a stormwater management system for the proposed Tech Smith headquarters to be located on the Michigan State University campus in East Lansing, Michigan . Stormwater captured by buildings, sidewalks and other paved areas is to be conveyed to an on-site holding pond through a proposed system of junctions (manholes) and conduits (pipes). Using both spreadsheet approaches and a sophisticated simulation software – MAGNET StormNET - you will design (and then refine) the pipes (including their sizes, slopes, and roughness) and a holding pond (total volume, dimensions, and outflow control structures). You will also assess potential impact of Low Impact Development (LID) controls or other green infrastructure integrated into the system.
(Featured Active Learning Projects- 25)